Region FA_Prog Town[1] Proj_Num Project Description Phase Year Federal State Local Total
06 STPB   Ansonia 0002-0123 Prindle Ave: Reconstruction & alignment CON 2003 $1,229.8 $307.4 $0.0 $1,537.2
06 STPB   Ansonia 0002-0124 Hill St/Root Ave: Reconstruction from Benz St to Jewett St CON 2003 $1,480.0 $370.0 $0.0 $1,850.0
06 STPB   Shelton 0126-0156 Perry Hill Road: Realignment & minor widening CON 2003 $1,560.0 $390.0 $0.0 $1,950.0
06 STPB   Shelton 0126-0160 East Village Road: Realignment & minor widening ROW 2003 $68.0 $8.5 $8.5 $85.0
06 STPB   Shelton 0126-0161 Commerce Dr: Widen, reconstruct & resurface 4,400 feet CON 2003 $2,134.0 $515.0 $19.0 $2,668.0
07 STPB   Stratford 0138-0217 Tavern Rock Rd: Widening, drainage & horizontal & vertical realignment CON 2003 $835.2 $208.8 $0.0 $1,044.0
        Total FFY 2003 -- STPB     $7,307.0 $1,799.7 $27.5 $9,134.2
07 NHS   Fairfield 0050-0204 Rte 15: Resurface, bridge & safety: Congress Street to Morehouse Highway, AC conversion CON 2003 $5,120.0 $1,280.0 $0.0 $6,400.0
07 NHS   Monroe 0084-0100 Route 25: Replace bridge (#02219) over Pequonnock River CON 2003 $605.0 $95.0 $0.0 $700.0
07 NHS   Trumbull 0144-0178 Rte 15: Median deck repairs, #00750, Reservoir Ave - AC conversion CON 2003 $102.0 $26.0 $0.0 $128.0
07 NHS   Trumbull 0144-0179 Rte 25: Resurface, bridge & safety project: Rte 15 to Rte 111 CON 2003 $2,830.0 $708.0 $0.0 $3,538.0
07 NHS   Trumbull 0144-0180 Rte 15: Resurface, bridge & safety: Morehouse Highway to Route 8, AC conversion CON 2003 $4,000.0 $1,000.0 $0.0 $5,000.0
07 NHS   Trumbull 0144-0181 Route 25: Construct intersection improvements & minor widening ROW 2003 $80.0 $20.0 $0.0 $100.0
70 NHS   Statewide 0170-2004 Highway Operations Center CDOT Headquarters, 24 hrs CON 2003 $700.0 $175.0 $0.0 $875.0
70 NHS   Statewide 0170-H847 Pavement Management analysis NHS routes PE 2003 $224.0 $56.0 $0.0 $280.0
70 NHS   Statewide 0170-H940 Install permanent traffic counting loop detectors CON 2003 $720.0 $180.0 $0.0 $900.0
73 NHS   District 3 0173-0326 I-95: Operate Incident Management System - NY SL to Branford CON 2003 $1,395.0 $155.0 $0.0 $1,550.0
        Total FFY 2003 -- NHS     $15,776.0 $3,695.0 $0.0 $19,471.0
06 HPP   Ansonia 0002-0114 Bridge Restoration: Rte 334 over Naugatuck River & MNRR CON 2003 $156.0 $0.0 $39.0 $195.0
07 HPP   Bridgeport 0015-0288 Seaview Ave: Construct Seaview Ave corridor project ROW 2003 $428.0 $0.0 $106.0 $534.0
73 HPP   District 3 0301-T093 NH-ML: Catenary replacement Bridgeport to New Haven Section D (will be shifted to 5309) CON 2003 $8,904.0 $2,226.0 $0.0 $11,130.0
        Total FFY 2003 -- HPP     $9,488.0 $2,226.0 $145.0 $11,859.0
70 BRXZ   Statewide 0170-OBRX On & off-systems bridge improvements - BRX & BRZ programs CON 2003 $60,000.0 $15,000.0 $0.0 $75,000.0
        Total FFY 2003 -- BRXZ     $60,000.0 $15,000.0 $0.0 $75,000.0
07 CMAQ   Bridgeport 0015-T034 MetroPool: Bridgeport TDM Office OTH 2003 $114.0 $0.0 $0.0 $114.0
07 CMAQ   Bridgeport 0015-Txxx GBRPA: Trip reduction program - SFY 2003/FFY 2002 OTH 2003 $80.0 $0.0 $20.0 $100.0
70 CMAQ   Statewide 0170-H914 Vehicle Emissions Inspection Program - Phase financing OTH 2003 $4,200.0 $0.0 $1,050.0 $5,250.0
76 CMAQ   State Sev-17 0170-P013 Telecommuting partnership OTH 2003 $209.0 $52.0 $0.0 $261.0
76 CMAQ   State Sev-17 0170-T509 MetroPool: Commute incentive program OTH 2003 $435.0 $0.0 $109.0 $544.0
76 CMAQ   State Sev-17 0170-T519 Southern Connecticut vanpool program OTH 2003 $273.0 $0.0 $0.0 $273.0
76 CMAQ   State Sev-17 0170-T540 Alternate fueled vehicles demo project OTH 2003 $650.0 $0.0 $162.0 $812.0
75 CMAQ   State Serious 0170-T541 Alternate fueled vehicles demo project OTH 2003 $650.0 $162.0 $0.0 $812.0
70 CMAQ   Statewide 0170-T543 Global Positioning System OTH 2003 $1,236.0 $309.0 $0.0 $1,545.0
76 CMAQ   State Sev-17 0170-T544 ConnDOT: Commute alternative staff OTH 2003 $480.0 $0.0 $0.0 $480.0
75 CMAQ   State Serious 0170-T545 ConnDOT: Commute alternative staff OTH 2003 $206.0 $0.0 $0.0 $206.0
76 CMAQ   State Sev-17 0170-T546 Publish/distribute Commuter Register OTH 2003 $261.0 $0.0 $0.0 $261.0
75 CMAQ   State Serious 0170-T547 Publish/distribute Commuter Register OTH 2003 $261.0 $0.0 $0.0 $261.0
76 CMAQ   State Sev-17 0170-T549 Deduct-a-ride program OTH 2003 $305.0 $0.0 $0.0 $305.0
76 CMAQ   State Sev-17 0170-T551 Statewide marketing OTH 2003 $743.0 $0.0 $0.0 $743.0
75 CMAQ   State Serious 0170-T552 Statewide marketing OTH 2003 $318.0 $0.0 $0.0 $318.0
76 CMAQ   State Sev-17 0170-T553 Statewide transit information project OTH 2003 $455.0 $0.0 $0.0 $455.0
75 CMAQ   State Serious 0170-T554 Statewide transit information project OTH 2003 $195.0 $0.0 $0.0 $195.0
76 CMAQ   State Sev-17 0170-T556 Employer services OTH 2003 $286.0 $0.0 $0.0 $286.0
75 CMAQ   State Serious 0170-T557 Employer services OTH 2003 $122.0 $0.0 $0.0 $122.0
07 CMAQ   Fairfield 0301-0060 New Fairfield RR station, access road & high level platforms ROW 2003 $2,880.0 $720.0 $0.0 $3,600.0
        Total FFY 2003 -- CMAQ     $14,359.0 $1,243.0 $1,341.0 $16,943.0
07 STPA   Bridgeport 0015-0226 Rte 130: Reconstruct & drainage improvements, Fairfield Ave to Broad St - AC Entry CON 2003 $0.0 $0.0 $0.0 $0.0
07 STPA   Bridgeport 0015-0227 SR 700: Reconstruction, State St to Lafayette Sq - AC Entry CON 2003 $0.0 $0.0 $0.0 $0.0
07 STPA   Bridgeport 0015-0271 I-95: Reconstruction, Warren St-Yellow Mill Contract "P" - Phase financing CON 2003 $4,500.0 $500.0 $0.0 $5,000.0
07 STPA   Bridgeport 0015-0272 I-95: Reconstruction, State St-Wordin Ave Contract "B" - Phase financing CON 2003 $6,300.0 $700.0 $0.0 $7,000.0
06 STPA   Seymour 0124-0158 Rte 334: Realign Southwest Rd to Commerce Rd - AC entry CON 2003 $0.0 $0.0 $0.0 $0.0
70 STPA   Statewide 0170-2006 Install rimble strips various highways - AC Conversion CON 2003 $430.0 $108.0 $0.0 $538.0
70 STPA   Statewide 0170-2235 Durable pavement markings on non-Interstates - Phase 2 CON 2003 $1,120.0 $280.0 $0.0 $1,400.0
70 STPA   Statewide 0170-2236 Durable pavement markings at intersections - Phase 2 CON 2003 $800.0 $200.0 $0.0 $1,000.0
70 STPA   Statewide 0170-H850 Pavement management analysis/data collection, state STP rds PE 2003 $192.0 $48.0 $0.0 $240.0
70 STPA   Statewide 0170-H887 Design STC-approved traffic signals PE 2003 $740.0 $0.0 $0.0 $740.0
07 STPA   Bridgeport 0173-0289 US Rte 1: Intersection improvements - Bayview & Shoppers Fair centers CON 2003 $1,352.0 $338.0 $0.0 $1,690.0
07 STPA   Bridgeport 0173-0291 US Rte 1: Inter. improvements - various locations in Bridgeport and Fairfield CON 2003 $4,664.0 $0.0 $0.0 $4,664.0
73 STPA   District 3 0173-0325 Install/revise STC traffic signals in District 3 - AC conversion CON 2003 $400.0 $100.0 $0.0 $500.0
73 STPA   District 3 0173-0339 Install/revise STC traffic signals in District 3 - AC conversion CON 2003 $594.0 $0.0 $0.0 $594.0
73 STPA   District 3 0173-0341 Install/revise STC traffic signals in District 3 - Phase financing CON 2003 $594.0 $0.0 $0.0 $594.0
73 STPA   District 3 0173-0342 Install/revise STC traffic signals in District 3 ROW 2003 $16.0 $4.0 $0.0 $20.0
74 STPA   District 4 0174-0280 Install/revise STC traffic signals in District 4 - AC conversion CON 2003 $480.0 $120.0 $0.0 $600.0
74 STPA   District 4 0174-0285 Install/revise STC traffic signals in District 4 -SFY 2002 CON 2003 $154.0 $38.0 $0.0 $192.0
74 STPA   District 4 0174-0294 Install/revise STC traffic signals in District 4 - AC conversion CON 2003 $195.0 $0.0 $0.0 $195.0
74 STPA   District 4 0174-0300 Install/revise STC traffic signals in District 4 ROW 2003 $16.0 $4.0 $0.0 $20.0
74 STPA   District 4 0174-0304 Install/revise STC traffic signals in District 4 -SFY 2002 CON 2003 $732.0 $0.0 $0.0 $732.0
        Total FFY 2003 -- STPA     $23,279.0 $2,440.0 $0.0 $25,719.0
06 STPT   Derby 0036-0178 Naugatuck River bicycle trail, Phase I & II CON 2003 $1,122.0 $0.0 $281.0 $1,403.0
07 STPT   Stratford 0138-0204 Tital wetland restoration at Bridgeport Airport in Stratford CON 2003 $56.0 $14.0 $0.0 $70.0
07 STPT   Stratford 0138-0205 Housatonic RiverBelt Greenway, Sniffens Lane to Riverview Pl CON 2003 $842.0 $0.0 $210.0 $1,052.0
        Total FFY 2003 -- STPT     $2,020.0 $14.0 $491.0 $2,525.0
70 STPXZ   Statewide 0170-SFTY On & off systems Safety Program: STPX & STPZ programs ALL 2003 $6,354.0 $706.0 $0.0 $7,060.0
        Total FFY 2003 -- STPXZ     $6,354.0 $706.0 $0.0 $7,060.0
[1] Projects listed as Statewide, District or Various refer to general project types that could be implemented statewide, in District 3 or 4, or at various locations. The projects are included in the MPO's TIP for information purposes only.